New Home Build Checklist — full sample

This is the actual structure our generator produces from the default answers. When you buy, you fill in the form and your version reflects your household — rooms, timeline, province, and everything else.

Phase 1 — Land, financing & design

  • Confirm builder contract with your builder
  • Read the full purchase/builder agreement line by line before signing — confirm what's included vs. upgrade-only
  • Retain a lawyer to review the agreement of purchase and sale before signing anything
  • Confirm the deposit structure and what protection applies if the builder delays or defaults
  • Verify lot ownership, zoning, and setbacks
  • Confirm any lot premium and exactly what it covers (corner lot, ravine, walkout basement)
  • Request the builder's standard specification sheet — what's actually included at the base price
  • Order geotechnical / soil report if required
  • Mortgage pre-approval with construction-progress draws
  • Down payment schedule agreed and documented
  • Insurance broker briefed on new-build coverage
  • Home design finalized and stamped by architect / designer
  • Energy modelling / building code compliance done
  • Building permit filed (ON)
  • Development / lot levies paid
  • Confirm HST new-housing rebate eligibility and who applies for it (builder credit vs. buyer claim)
  • Utility service applications submitted (gas, hydro, water, internet)
  • Survey stakes placed on lot
  • Avoid outswinging exterior doors except on closets — they're harder to secure and awkward with a storm door
  • Don't downsize door widths to save money — 34-36 inch interior doors cost little more now and are expensive to widen later
  • Confirm enough wall space is planned around every door for trim and furniture clearance
  • Plan the mechanical room close to where outdoor HVAC equipment will sit — running refrigerant lines and venting through a finished ceiling later is expensive and leak-prone
  • Plan the laundry area separate from bedrooms if kids will do their own laundry closer to their rooms later
  • Confirm driveway width actually fits the number of vehicles you own
  • Confirm garage width and depth allow for tool chests and a workbench, not just parking
  • Confirm patios are at least 8 ft deep and porches have room for seating plus a walking path around people sitting

Phase 2 — Selections & allowances

  • Book design centre / selections appointments before the structural-change cutoff date
  • Confirm the structural change deadline — after this date, layout changes are no longer possible
  • Get the allowance schedule in writing (flooring, lighting, plumbing fixtures, appliances) and what happens on overage
  • Track every selection in one document: item, room, brand/model, cost, allowance, overage
  • Confirm lead times on special-order items (custom cabinetry, imported tile, specialty appliances) against your closing date
  • Get every verbal upgrade agreement in writing as a signed, priced change order
  • Confirm which selections are locked once submitted vs. still changeable later
  • Compare included baseboard, trim, and door hardware against what you actually want before assuming it's covered
  • Confirm exterior colour/material selections (siding, brick, roof shingle) against neighbourhood architectural guidelines
  • Keep copies of every signed selection sheet and change order for the final walkthrough

Phase 3 — Excavation & foundation

  • Ground-breaking scheduled around start month
  • Excavation and hoarding complete
  • Footings poured and inspected
  • Foundation walls poured / laid
  • Confirm foundation type and depth match the geotechnical report, not just the standard plan
  • Foundation waterproofing + drainage tile
  • Weeping tile connected to a sump pit or gravity drain, not left disconnected
  • Photograph the foundation before backfill — this is your only record of what's now underground
  • Backfill and rough grading
  • Photograph or video every utility line from the road to the house before backfill — you'll never see them again
  • Foundation inspection signed off

Site utilities — rough in while it's already dug up

  • Rough in a 3/4-inch copper or poly line for a future sprinkler system
  • Install French drains and yard drainage before topsoil and sod go down
  • Add yard catch basins for cleanouts where water tends to pool
  • Add downspout leaf filters and cleanouts so gutters stay clear without re-digging later
  • Install a yard hydrant now for bouncy castles, a greenhouse, or watering the back of the lot with real pressure
  • Run a 100-amp service to the shed now for an RV plug, pool equipment, or anything else — this is the cheapest it will ever be to do
  • Run a gas line to the shed if pool equipment or a future generator will need it
  • Rough in a sewer drain at a pool-shed location while the yard is already torn up
  • Have the concrete crew pour the shed pad, equipment pads, and sidewalks while they're already on site — small standalone concrete jobs are hard to get priced later and you won't want to tear up a finished yard again

Phase 4 — Framing & envelope

  • Framing walk-through (3 bedrooms, 2 bathrooms verified)
  • Confirm window and door rough openings match approved selections, not just the standard plan
  • Confirm ceiling heights match what was sold — measure, don't assume
  • Walk the frame with the plans in hand before drywall closes it in for good
  • Fireplace type and venting confirmed before framing closes around it (wood, gas direct-vent, or electric each need different clearances)
  • Roof framing / trusses installed
  • Sheathing, house wrap, windows and exterior doors
  • Ice-and-water-shield membrane confirmed at eaves, valleys, and skylights before shingles go on
  • Roofing shingles / membrane installed
  • Garage rough-in for 2 bays
  • Confirm exterior door swing direction and hardware match your household's actual traffic flow
  • Seal the ground-level perimeter thoroughly against pests — spray foam every gap for a genuinely tight seal
  • Add nailing blocks in the walls for curtain rods, towel bars, toilet paper holders, and tub/shower grab bars — hard to add cleanly after drywall
  • Install soffit lighting now — nobody wants to work in the attic to add this later
  • Add soffit plugs for security cameras or holiday lighting while the soffit is open
  • Framing inspection signed off

Phase 5 — Rough-ins

  • Plumbing rough-in walk-through
  • Rough in plumbing in the basement now, even if you're not finishing it yet — far cheaper than breaking concrete later
  • Confirm floor drain locations in the laundry room, mechanical room, and basement
  • Add a floor drain and a dedicated car-cleaning area in the garage
  • Dryer vent routed with the shortest, straightest run possible to the exterior
  • Rough in the laundry box and dryer vent flush with the wall — proud fittings push the machine out and waste space
  • Exhaust fan ducting confirmed to vent outside (not into the attic) for every bathroom
  • Ask your plumber about tankless vs. boiler, and whether fixtures far from the tank need a recirculation line or a tub-fill flow restrictor
  • Install a hot water mixing valve or a laundry/utility sink in the garage — warm water for pressure washing, filling kiddie pools or bouncy castles, and washing the car
  • Install frost-free hose bibs with an interior shutoff/drain valve so they can be drained before winter without going outside
  • Rough in a pot filler location above the stove, and consider one near the coffee station
  • Decide battery-backup vs. water-powered backup sump pump before rough-in — water-powered needs a dedicated supply line
  • Ask about a Moen Flo (or equivalent) whole-home water leak detection and auto-shutoff system
  • Get an early water test done and ask about water treatment or softening equipment before the mechanical room is finished
  • Electrical rough-in walk-through (verify outlet, switch, and data locations)
  • Confirm every switch location against actual furniture placement, not just the standard plan
  • Confirm outlet count and placement in the kitchen and home office meet real usage, not just code minimums
  • USB/USB-C or smart-outlet locations confirmed if wanted — last chance before drywall
  • Wire dedicated circuits for a chest freezer and a garage fridge
  • Wire every major appliance location for both gas and electric, even if only installing one now — energy costs shift over the life of the house
  • Add whole-home surge protection at the panel, plus point-of-use surge protection on major appliances
  • Decide on a backup power plan — standby gas generator, battery backup, or solar-plus-battery — and rough in the transfer switch/conduit now
  • Add bidet-ready outlets near toilets
  • Add a garage pull-down electrical reel
  • Conduit or cable run to the garage for a future EV charger, even if not installing one now
  • Add exterior outlets near the play area or on a yard post for bouncy castles and outdoor equipment
  • HVAC rough-in (ducts, furnace location, HRV/ERV)
  • HVAC zoning and duct sizing confirmed for rooms over garages and vaulted ceilings — the most common comfort complaint in new builds
  • Plan HVAC and plumbing routing to avoid a condensate pump where possible — gravity drainage is quieter and one less thing to fail
  • Thermostat location confirmed away from direct sunlight, supply vents, and exterior doors
  • Use shielded thermostat wire to avoid interference issues with smart thermostats down the road
  • Low-voltage rough-in (alarm, cameras, network, speakers)
  • Rough in wiring for smart blinds in key rooms
  • Rough in structured wiring for a home network/server cabinet, not just a single low-voltage panel
  • Hardwire doorbell cameras instead of battery-only — batteries are one more maintenance item
  • Confirm every smoke detector is hardwired, not battery-only
  • Structured wiring panel location confirmed accessible for future network upgrades
  • Rough-in inspection signed off

Phase 6 — Insulation, drywall & interior

  • Insulation and vapour barrier
  • Confirm insulation R-value matches what was sold, especially in the attic and above the garage
  • Insulation inspection signed off
  • Book an independent pre-drywall inspection — the only chance to see rough-ins before they're sealed behind walls
  • Video every wall with electrical and plumbing rough-in before insulation and drywall close it in — the only complete record you'll have
  • Ask about acoustic sound board (e.g. Sonopan) between shared walls and floors for noise control
  • Drywall hung, taped, mudded
  • Primer and paint
  • Walk every room and confirm paint colours match approved selections before the crew moves to the next room
  • Kitchen cabinets and vanities installed
  • Confirm cabinet hardware, pulls, and soft-close features match what was selected, not the builder's default
  • Countertops templated and installed
  • Interior doors, trim, and baseboards
  • Flooring installation
  • Tile in wet areas
  • Confirm grout colour and tile pattern match the approved layout before grouting — this can't be undone
  • Plumbing fixtures set
  • Confirm shower/tub valve and showerhead height before tile closes in the rough-in for good
  • Electrical trim (fixtures, devices, panel labels)
  • Verify every light fixture location and style against the selection sheet before final trim
  • Install smart switches and smart plugs at the locations planned during rough-in, not as an afterthought
  • Install smart door locks on exterior doors at final trim — note that French doors are hard to fit with locks, plan hardware accordingly
  • Get at least one interconnected Wi-Fi smart smoke/CO detector so you're alerted on your phone, even if the rest are standard hardwired units
  • Panel directory labelled and matched to actual circuits, not left blank

Phase 7 — Exterior finishes

  • Siding / stucco / brick complete
  • Soffit, fascia, eavestroughs
  • Confirm final grade slopes away from the foundation on all sides
  • Downspouts discharge away from the foundation, not against it
  • Exterior caulking complete around every window, door, and penetration
  • Driveway paved
  • Landscaping and sod / topsoil
  • Plant trees as early as possible — they take years to establish, so the earlier they're in the ground the better
  • Deck / porch / railings
  • House numbers, mailbox, and exterior lighting installed and working
  • Garage door opener installed, programmed, and remotes handed over
  • Final grading

Phase 8 — Pre-delivery inspection (PDI) & closing

  • Target closing / possession: closing month
  • Pre-delivery inspection walk-through with builder
  • Test every switch, outlet, fixture, faucet, and appliance during the PDI — not just a visual walkthrough
  • Run every window and door to confirm smooth operation and proper seal
  • PDI form completed with photos of every deficiency
  • Confirm the deficiency list has target completion dates in writing, not just a verbal promise
  • Do not sign off the PDI as complete if items remain outstanding — sign a deficiency list instead
  • Register with Tarion (mandatory in Ontario) — mark the 30-day, year-end (12-month), and second-year (24-month) warranty form deadlines on your calendar now
  • Final lawyer statement of adjustments reviewed line by line (property tax, utility, and warranty enrolment adjustments)
  • Land transfer tax and any rebate application confirmed before closing
  • Occupancy permit issued
  • Utilities transferred to your name
  • Home insurance policy active from possession date
  • Final mortgage advance and lawyer signing complete
  • Locate the main water shutoff, electrical panel, and furnace filter before your first night in the home
  • Keys handed over — change locks day one